SVIET
Swami Vivekanand Institute of Engineering & Technology
Chandigarh-Patiala Highway, Sector-8, Ramnagar, Banur, District Patiala (Pb.)
Approved by AICTE, Affiliated to Punjab Technical University
sviet
  Admission Btech
Swami Vivekananda Ji "Arise, awake and stop not till the goal is reached."
Swami Vivekananda
 
 
INDUSTRIAL TRAINING 2011

 
Date of Viva Schedule  
ATTENDANCE FORMAT EVALUATION FORM INSTRUCTIONS SYNOPSIS FORMAT PROJECT FORMAT

Important Instructions

  1. Student should attend the training regularly and must mark the daily attendance as per company's rule.
  2. Students is required to maintain strict discipline and confidentiality at the place of work.
  3. Students must inform the Training Officer about the change of deptt /section/shift or outdoor visits by the company. The faculty member will visit your place of work during the training period. During the faculty's visit, if you are not found at the place of training (without a valid reason), you will be marked absent. No excuses will be accepted for this.
  4. Long leave is not permitted during the Industrial Training.
  5. In case you have to change your training from one Company to another, the permission for the same must be obtained from training officer in advance and submit the project report for both.
  6. Students who have to appear for the supplementary exam during the course of Industrial Training will take leave from the company well in advance and submit a copy of the leave certificate.
  7. Students must pay attention to prepare these documents : Daily Diary, Mid Semester Report, Training cum project report and ensure timely submission of these with in 8 to 10 days of completion of training. It should be Signed/Authenticated by Training Manager. Prepare two sets of documents one for submission and other for your own record.
  8. Training report will include (1) Contents, (2) Acknowledgments (3) Company Profile ( 4) Details of the training (5) Details of the project work done so far. (6) Bibliography.
  9. Mid Semester Report and Final Training-cum-Project reports should be individual's own effort and not copied even if same project is being done by more than one student, only the company profile can be same.
  10. Standards for project report :
    • Paper Size = A4
    • Spacing between Lines = 1.5 inch
    • Font Size = 13
    • Fonts = Times New Roman or any compatible font in case of unavailability of recommended fonts.
    • Left Margin = 1.5 inch
    • Right Margin = 0.5 inch
    • Top Margin = 1.25 inch
    • Bottom Margin = 1.25 inch
    • Hard Bound document to be submitted
    • Header Contents: Report Title
    • Footer Contents: College name and page number
  11. Students must follow the guidelines for the standard for project report as specified.
  12. The CONTENTS page is a must for all documents, must have the page numbers written against heading.
  13. Certificate on the front cover page, you may add company's Photograph / logo at appropriate place.
  14. Appreciation Letter : If any should be part of the project report.
  15. You should send the documents through post/courier/person and need not to come personally unless you have any other important/urgent work in the Institute.
  16. Industrial training feedback report complete in all respects must reach to training officer in a sealed envelope within seven days on the completion of the training.


 
Placements@Sviet

SocialTwist Tell-a-Friend
HomeNews College Norms Notice BoardResultsTime-TablePTU DateSheetStudent ForumJobsStaff MailApplication Form Photo GalleryContact Us
Copyright © 2008 Sviet | Website designed and developed by Deptt of SVRTP Best Punjab engineering college     Hits Counter 
Best View With Internet Explorer 6.0+, Flash Player 6+, 1024x768 Resolution, Medium Font Size